When Should Party Wall Notices Be Served?

row of terraced houses - when should party wall notices be served?
This is a collaborative post

When a homeowner lives in a terraced or semi-detached house or a flat and they wish to carry out work that involves a party wall, then the Party Wall Act must be referred to. This will provide property owners with the information they need before any work is carried out on or near an adjoining wall. 

It’s imperative that the Party Wall Act 1996 is adhered to in order to prevent any legal action from being taken. So what is a party wall, why should you serve a party wall notice if you need to carry out work on your adjoining wall and when should you serve your neighbour(s) with a party wall notice?

What is a party wall?

In short, a party wall is a wall that makes up the boundary line between two adjoining properties and, subsequently, two different homeowners. If one lives in a mid-terraced house, then there will be at least two party walls that adjoin houses on either side and so, in this instance, three different homeowners will be joined together.

What is the purpose of a Party Wall Notice?

A Party Wall Notice needs to be served to your adjoining neighbour(s) should you wish to carry out work on a party wall. This needs to detail your intent for starting renovations or conducting structural work on, or that involves the party wall. 

Once the Party Wall Notice has been served, your neighbour has a certain amount of time to dispute the work, but if you don’t hear from them, then you can assume that they’re happy for the party wall to have work carried out on it.

Home renovations that require a Party Wall Notice to be served

You will need to serve a Party Wall Notice and have a Party Wall Agreement drawn up, in writing, if you wish to carry out the following work on the party wall:

  • Any work involving adjoining walls between semi-detached or terraced houses
  • Work involving ‘party structures’, such as floors or ceilings between flats
  • Work to garden walls or fences
  • Excavation works to your home, including underpinning
  • Inserting damp-proof courses into a party wall
  • Constructing a second-storey (or more) extension on top of or involving a party wall
  • Building a new wall up to, including or off a party wall
  • Making party walls thicker or higher
  • Loft or cellar conversions that means cutting into a party wall

If you’re using a builder or architect to help you with any construction works, then they’ll be able to advise you on whether or not a Party Wall Notice and Agreement is needed. It’s important to note that a Party Wall Notice and a Party Wall Agreement are two separate documents and both are needed in order to comply wholly with the Party Wall Act. If you aren’t sure, then be sure to ask a highly-qualified, experienced party wall surveyor. 

row of terraced house

When should a party wall notice be served?

When you serve a Party Wall Notice depends on when you want the work to be carried out. A Party Wall Notice needs to be served within 12-2 months before work is due to start on a party wall. Although, it’s recommended that you speak to your neighbours face-to-face, informally, before serving them with a Party Wall Notice. You should let them know of your intentions to start renovations or construction work on a party wall. 

Give them the opportunity to ask you any questions and talk openly about your plans. They might well give you verbal consent to proceed with planned works, but even then, you will still need to serve them, formally, with a Party Wall Notice in order to comply with the Party Wall Act 1996.

When drawing up a Party Wall Notice, there are several things you should include or provide your neighbour(s) with, including the following:

  • Your contact details
  • Detailed plans or planned work
  • The date you wish the work to start
  • Any access requirements over their property, if applicable

If the adjoining property/properties are leasehold, then you’ll also need to serve the building or landowner with a Party Wall Notice, as well as the person who resides in the property/properties. If you aren’t sure about how to go about this, then you should appoint a skilled, dedicated party Wall Surveyor for help and advice.

What happens if you do not serve a party wall notice?

Failing to provide your neighbour(s) with a Party Wall Notice is not a legal offence but it means that you will be breaching a ‘statutory duty’ and you might also be held financially accountable for any damage done to the party wall that wasn’t your fault. 

Your neighbour(s) could claim that their wall has been damaged by work you’re carrying out, so if you have not given them any details or notice of the work, then your neighbour(s) could take civil action against you.

It’s likely that you’ll lose the civil case if a Party Wall Notice has not been served, especially if you do not have any before and after pictures of both sides of the party wall. Work could also cease if damage has been done or if work is carried out without a Party Wall Notice being served. Avoid these complications by serving your neighbour(s) with a Party Wall Notice in compliance with the Party Wall Act 1996.